Kings College London – James Black Centre13 Mar 20190Refurbishment works are well underway at Kings College London within their James Black Centre. The works are to carry out…
Watford Hospital – Paediatric Assessment Unit4 Mar 20190New project secured Watford Hospital – Paediatric Assessment Unit The scope of the works comprises of the full refurbishment of…
Basildon Hospital Willow Ward Enabling4 Mar 20190New project secured Basildon Hospital Willow Ward Enabling The scope of the works comprises of the refurbishment and enabling works…
Cold Room Refurbishment Works4 Feb 20190New project secured consisting of the removal of an existing cold room and refurbishment fit out of the new within…
Royal Free Hospital – UCL4 Feb 20190New project secured. Works shall comprise of the refurbishment the existing lower ground floor locker room and hot desking room…
Stoke Mandeville Hospital – Upper Limb Studio Centre4 Feb 20190New project secured – Mechanical works comprise of the refurbishment the existing ground floor area to convert into the new…
RFH & UCL Population Science – Chiller Replacement21 Jan 20190New project secured Royal Free Hospital – RFH & UCL Population Science, Chiller Replacement. The work comprises of the removal…
NHSPS Orpington Health & Wellbeing Centre3 Jan 20190NHS Property Services (NHSPS) is undertaking the £3million interior fit out programme on behalf of NHS Bromley Clinical Commissioning Group…
University Hospital Lewisham24 Nov 20180University Hospital Lewisham Digital X-Ray Works New project secured which comprises of 3 no. X-Ray rooms, a viewing room, a…
Royal Marsden Hospital – Sutton25 Oct 20180New project secured Royal Marsden Hospital Linear Accelerator (Linac) inside an existing treatment room, together with upgrading works in adjacent…